Reliability heritage
Reliable since 1993
Veeral builds power converters that stay in service. The record below comes from projects already listed on this site.
By the record
Built to last in the field
1993
Inception of Veeral Controls. Over three decades of design and field experience.
ISO 9001:2015
Certified processes for safety, precision, ultra-low ripple and high reliability.
8-15 years
Systems run in harsh climates for 8-15 years with consistent performance.
9+ countries
Projects executed in the United States, South Korea, Germany, Turkey, Sri Lanka, Australia, Oman and India.
Milestones
Systems that went into service
- 2000Developed sub 10 µs rise-time power system (World First)
- 2005India's first 500kVA STATCOM with IISc & C-DAC
- 2007World's then-largest 4-quadrant inverter (12000A, 250V) for Tokamak plasma control
- 20100-200V, 10000A single-phase supply for ITW Signode continuous process
- 2016-2018400 MW of wind converters installed in India and abroad
- 2018Container load of STATCOM / inverters for Turkey Rail
- 2019Large shipment of predictive STATCOM for Australia
- 202036kA rectifier system for nuclear-grade sodium (Heavy Water Board)
- 202272kA rectifier system for commercial grade sodium plant
- 2025Exported 1.4MW single-phase inverter to Australia (AS/NZS 3000:2018 compliant)
How it is built
In-house design, tested for extremes
Made for Extreme Conditions
Our systems run in harsh climates for 8-15 years with consistent performance.
In-House R&D & Manufacturing
Full control over design > engineering > production > testing > commissioning.
Commitment to Quality
ISO 9001:2015 certified processes. High safety, precision, ultra-low ripple, high reliability.